Concretestone How To Do It

  1. the cement screws should previously smoothed. or, if already pre-existing, scarified.
  2. the surface should be generously soaked one day before the application of Concretestone.

Concretestone application:

  1. application of Concretebond agent.
  2. application of Concretestone mixture (Concretestone color mix-Cement-aggregates) with thickness from 2 to 4 cm.
  3. finishing and smoothing the surface.
  4. application of Concretepeal.
  5. within 12-24 hours proceed with washing of the surface using a pressure washer and a mono brush.
  6. after a few days, application of Concreteseal is recommended.

Surface preparation: